Stage four: Measure the duration on the overhang (soffit). Typically, two elbows will likely be needed to convey the downspout within the eave (overhang/soffit) to your wall on the construction. Along with a bit of downspout can be essential among The 2 elbows to span the soffit. Technically, the “downpipe” portion of the exhaust method conn